Below is a list of PGSR’s completed projects
| PGSR Completed Project History |
| Project 190 was completed on 29/11/2011 at Moomba, Cooper Basin, SA. PGSR provided Personnel for Steam Turbine Rotor Removal |
| Project 220 was completed on 20/11/2011 at Port Moresby, PNG. PGSR provided Personnel for Contract Labour Supply to Wartsila PNG. |
| Project 221 was completed on 16/11/2011 at Visy Pulp and Paper, Tumut, NSW. PGSR provided Personnel for Repack Main Steam Supply Control Valve 20MW Steam turbine. |
| Project 211 was completed on 11/11/2011 at CSBP, Kwinana, WA. PGSR provided Personnel for Mitsubishi 12meg Steam Turbine and Barrell Compressor Major Overhaul. |
| Project 223 was completed on 17/10/2011 at Tallawarra Power Station, Woolongong, NSW. PGSR provided Personnel for Valve Overhaul Crew. |
| Project 218 was completed on 30/09/2011 at Moomba, Cooper Basin, SA. PGSR provided Personnel for Volvo turbine change with refurb unit. Install overhauled spare including alignments to the compressor, etc. |
| Project 195 was completed on 24/09/2011 at Glenbrook, NZ. PGSR provided Personnel for Generator Major Inspection |
| Project 198 was completed on 11/09/2011 at Port Moresby, PNG. PGSR provided Personnel for Hydraulics Workshop Development. |
| Project 214 was completed on 9/09/2011 at Cockburn Power Station, Kwinana, WA. PGSR provided Personnel for Major Over haul 13E2 GT, Steam Turbine and Both Generators. |
| Project 184 was completed on 27/08/2011 at Kooragang Island, NSW. PGSR provided Personnel for 2 x Steam Turbine Major Overhauls and 2 x Compressor Overhauls |
| Project 189 was completed on 21/07/2011 at Moomba, Cooper Basin, SA. PGSR provided Personnel for Major Overhaul on 2 x Westinghouse Steam Turbines. |
| Project 204 was completed on 5/06/2011 at Loy Yang A, Latrobe Valley, VIC. PGSR provided Personnel for 550meg Toshiba Generator overhaul and rotor replacement/upgrade including hydrogen seal. |
| Project 207 was completed on 27/05/2011 at Redbank Power Station, Singleton, NSW. PGSR provided Personnel for Shut Down planning for 150mg Steam Turbine Major Overhaul. |
| Project 196 was completed on 5/04/2011 at CSR Plane Creek, Sarina, QLD. PGSR provided Personnel for Steam Turbine Gearbox laser alignment and defect rectification |
| Project 201 was completed on 4/04/2011 at Alcoa Wagerup, WA. PGSR provided Personnel for Tool Container Hire. |
| Project 200 was completed on 15/03/2011 at Alcoa Wagerup, WA. PGSR provided Personnel for Steam Turbine Governor repair. |
| Project 192 was completed on 16/02/2011 at Woodside Pluto LNG Project, Burrup Peninsula, WA. PGSR provided Personnel for PGSR Workstation Hire for Frame 6 Generator Rotor. |
| Project 186 was completed on 21/01/2011 at BP Bulwer Island Refinery, Brisbane, QLD. PGSR provided Personnel for Pre-outage Spare Part Identification and Planning. |
| Project 175 was completed on 16/12/2010 at Moomba, SA. PGSR provided Personnel for Major overhaul on 2 westinghouse Steam Turbines. |
| Project 185 was completed on 24/11/2010 at Worsley Alumina, Collie, WA. PGSR provided Personnel for Frame 9E Gas Turbine maintenance – Cross fire tube gaskets and Flame Scanner Gasket. |
| Project 169 was completed on 17/11/2010 at Osborne Power Station, Adelaide, SA. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 176 was completed on 24/10/2010 at Parkeston, WA. PGSR provided Personnel for Major Inspection on Brush Generator, Including Manafacturing Skid Rail to facilitate rotor removal. |
| Project 171 was completed on 20/10/2010 at Alcoa Wagerup, WA. PGSR provided Personnel for Major on a Steam Turbine. |
| Project 174 was completed on 15/10/2010 at Moomba, SA. PGSR provided Personnel for Major overhaul on a westinghouse Steam Turbine. |
| Project 173 was completed on 15/10/2010 at Lihir Gold, Lihir Island, PNG. PGSR provided Personnel for Major Inspection on a Demag Compressor. |
| Project 149 was completed on 31/08/2010 at QAL, Gladstone, QLD. PGSR provided Personnel for Steam Turbine Major and Generator Overhaul. |
| Project 142 was completed on 24/08/2010 at Visy Pulp and Paper, Tumut, NSW. PGSR provided Personnel for Steam Turbine casing leak inspection. |
| Project 168 was completed on 16/07/2010 at Power and Water, Channel Island, Darwin, NT. PGSR provided Personnel for Generator Bearing Inspection. |
| Project 166 was completed on 28/06/2010 at Worsley Alumina, Collie, WA. PGSR provided Personnel for Frame 9E Gas Turbine Maintenance. |
| Project 162 was completed on 26/06/2010 at Pinjar Power Station, WA. PGSR provided Personnel for Generator Re-Wedge. |
| Project 151 was completed on 9/06/2010 at Bulwer Island, Brisbane, QLD. PGSR provided Personnel for Minor on a Pignone Steam Turbine and a Major on a Pignone Barrell Compressor. |
| Project 160 was completed on 3/06/2010 at IPM, Kwinana Cogen, Kwinana Beach, WA PGSR provided Personnel for Frame 6B Gas Turbine Major Inspection (MI). |
| Project 157 was completed on 2/06/2010 at Worsley Alumina, Collie, WA. PGSR provided Personnel for Frame 9E Gas Turbine Fuel Nozzle Inspection. |
| Project 143 was completed on 23/05/2010 at Bulwer Island, QLD. PGSR provided Personnel for Compressor Overhaul. |
| Project 156 was completed on 17/05/2010 at Swanbank, QLD. PGSR provided Personnel for 13e2 Gas Turbine Maintenance. |
| Project 155 was completed on 26/04/2010 at Millmerran, QLD. PGSR provided Personnel for Defect rectification on 450mw Steam Turbine. |
| Project 153 was completed on 14/04/2010 at NewGen, Kwinana, WA. PGSR provided Personnel for Breakdown Maintenance on a 13e2 Gas Turbine. |
| Project 136 was completed on 26/03/2010 at BP Bulwer Island, QLD. PGSR provided Personnel for Shutdown Planning. |
| Project 120 was completed on 20/12/2009 at Rio Tinto, Gove, NT. PGSR provided Personnel for Steam Turbine Minor Inspection. Strip Actuator Shaft. |
| Project 141 was completed on 16/11/2009 at Burrup Fertilizers, Dampier, WA. PGSR provided Personnel for Breakdown overhaul on a Demag Compressor. |
| Project 113 was completed on 11/11/2009 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for Turbine Rotor blasting on a 30MW Mitsubishi Steam Turbine. |
| Project 138 was completed on 12/10/2009 at AGL, Somerton. Vic PGSR provided Personnel for Frame 6B Gas Turbine Combustion Inspection (CI). |
| Project 135 was completed on 16/09/2009 at Hydro Tasmania, Bell Bay, TAS. PGSR provided Personnel for Pratt and Whitney FT8 35MW Gas Turbine service installation. |
| Project 134 was completed on 10/09/2009 at Alcoa Kwinana, WA. PGSR provided Personnel for PGSR Workstation hire for a 4 pole 20MW generator inspection. |
| Project 097 was completed on 3/09/2009 at Lihir Gold, Lihir Island, Papua New Guinea. PGSR provided Personnel for Demag compressor overhaul. |
| Project 087 was completed on 31/08/2009 at Santos, Moomba, SA. PGSR provided Personnel for Major Inspection of Westinghouse Steam turbine including Rotor Replacement. |
| Project 127 was completed on 19/08/2009 at Santos Ballera, SA. PGSR provided Personnel for Bearing change on an electric motor. |
| Project 128 was completed on 14/08/2009 at BHP Worsley, WA. PGSR provided Personnel for HP Steam Leak Rectification Unit 4 Steam Turbine. |
| Project 111 was completed on 13/08/2009 at Port Kennedy, WA PGSR provided Personnel for Procure, Design and Fitout our second 20 foot Sea container as a mobile workshop. |
| Project 108 was completed on 18/07/2009 at Swanbank E, Southside Brisbane, QLD. PGSR provided Personnel for GT 26 Gas Turbine Major Inspection. |
| Project 110 was completed on 10/07/2009 at Visy Paper, Tumut, NSW. PGSR provided Personnel for 20MW Steam Turbine and Generator Major Inspection. |
| Project 112 was completed on 1/07/2009 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 103 was completed on 27/06/2009 at Alcoa Pinjarra, WA. PGSR provided Personnel for Control Shaft Inspection Steam Turbine TA 3. Steam Turbine Major overhaul TA 5. |
| Project 094 was completed on 10/06/2009 at Boral, Roma QLD. PGSR provided Personnel for Frame 6B Gas Turbine Major Inspection (MI) . |
| Project 106 was completed on 28/05/2009 at Colongra GT Plant, NSW. PGSR provided Personnel for 4 x 13E2 Gas Turbine Fuel Nozzle change outs/FDS overhaul. |
| Project 109 was completed on 24/05/2009 at Mt Piper Power Station, Lithgow, NSW. PGSR provided Personnel for 700MW Toshiba Steam Turbine Major Inspection. |
| Project 107 was completed on 19/05/2009 at Hydro Tasmania, Bell Bay, TAS. PGSR provided Personnel for Pratt and Whitney FT8 35MW Gas Turbine service installation. |
| Project 096 was completed on 16/05/2009 at AGL, Somerton VIC. PGSR provided Personnel for Frame 6B Gas Turbine Combustion Inspection (CI). |
| Project 083 was completed on 11/05/2009 at BOC, Port Kembla, NSW. PGSR provided Personnel for Major Inspection of two Demag Compressors. |
| Project 100 was completed on 8/05/2009 at Bundaberg Sugar, Babinda, QLD. PGSR provided Personnel for Steam Turbine Assembly and Installation. |
| Project 105 was completed on 28/04/2009 at Swanbank E Power Station, QLD. PGSR provided Personnel for GT26 Gas Turbine Combustion Inspection (CI). |
| Project 104 was completed on 22/04/2009 at QNP, Moura, QLD. PGSR provided Personnel for Demag Compressor VK40-3, bearing inspection. |
| Project 088 was completed on 24/03/2009 at Hydro Tasmania, Bell Bay, TAS. PGSR provided Personnel for Pratt and Whitney FT8 35MW Gas Turbine service installation. |
| Project 092 was completed on 9/03/2009 at CSR Plane Creek, Sarina, QLD. PGSR provided Personnel for Steam Turbain Major Inspection. |
| Project 070 was completed on 4/03/2009 at Port Kennedy, WA PGSR provided Personnel for Procure, Design and Fitout 20 foot Sea container as a mobile workshop. |
| Project 091 was completed on 25/02/2009 at BOC, Whyalla, SA. PGSR provided Personnel for Demag Compressor Inspection. |
| Project 090 was completed on 16/02/2009 at Geothermal Plant, Innamincka, SA. PGSR provided Personnel for Pre outage Site Planning Visit for 1MW Geothermal Installation. |
| Project 086 was completed on 13/02/2009 at ATTAR in Morley WA. PGSR provided Personnel for NDT – Liquid Dye Penetration Training. |
| Project 085 was completed on 4/02/2009 at PGSR Workshop, Port Kennedy, WA. PGSR provided Personnel for Gas 001 and Gas 002 Training. |
| Project 084 was completed on 3/02/2009 at PGSR Workshop, Port Kennedy, WA. PGSR provided Personnel for Rotalign Ultra Proficiency Training. |
| Project 080 was completed on 25/01/2009 at Hydro Tasmania, Bell Bay, TAS. PGSR provided Personnel for Pratt and Whitney FT8 35MW Gas Turbine service installation. |
| Project 072 was completed on 24/12/2008 at Queensland Alumina Limited, Gladstone, QLD. PGSR provided Personnel for Major Inspection of 13MW DCT Trenton Steam Turbine and Electric Machinery Mfg. Generator. |
| Project 060 was completed on 20/12/2008 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for Frame 9E Gas Turbine Major Inspection (MI). |
| Project 043 was completed on 19/12/2008 at Rio Tinto, Alcan Gove, Nhulunbuy, NT. PGSR provided Personnel for Steam Turbine rotor removal and inspection and defect rectification. |
| Project 077 was completed on 5/12/2008 at Santos Moomba, SA. PGSR provided Personnel for Major Inspection of Westinghouse Steam turbine including Rotor Replacement. |
| Project 073 was completed on 1/12/2008 at Flinders Power, Port Augusta, SA. PGSR provided Personnel for Minor Steam Turbine LP inspection on TG2. |
| Project 074 was completed on 22/11/2008 at Clients Workshop, Perth, WA. PGSR provided Personnel for Major Inspection of 43MW Brush Generator. |
| Project 057 was completed on 2/11/2008 at Redbank Power Station, Singleton, NSW. PGSR provided Personnel for Steam Turbine Installation post overhaul. |
| Project 075 was completed on 29/10/2008 at BHP Olympic Dam, SA. PGSR provided Personnel for Steam Turbine and Valve Removal, Inspection, Installation and Commission. |
| Project 068 was completed on 27/10/2008 at Southern Cross Power Station, Mt Keith, WA. PGSR provided Personnel for Removal and Reinstallation of overhauled 43MW Brush Generator. |
| Project 063 was completed on 10/10/2008 at Minara Murrin Murrin, WA. PGSR provided Personnel for Risk mitigation inspections of Rotating Equipment. |
| Project 071 was completed on 6/10/2008 at Clients Workshop, Perth, WA. PGSR provided Personnel for Major Inspection of 43MW Brush Generator. |
| Project 062 was completed on 5/10/2008 at QNP, Gladstone, QLD. PGSR provided Personnel for Demag Compressor Major Inspection. |
| Project 064 was completed on 21/09/2008 at Clients Workshop, Perth, WA. PGSR provided Personnel for Major Inspection of a 43MW Brush Generator. |
| Project 045 was completed on 21/09/2008 at Alinta, Newman Power Station, WA. PGSR provided Personnel for Frame 6B Gas Turbine Hot Gas Path Inspection (HGPI). |
| Project 051 was completed on 19/09/2008 at IPM Power Station, Kwinana Beach, WA. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 067 was completed on 18/09/2008 at Roma Power Station, QLD. PGSR provided Personnel for Generator Major Inspection. |
| Project 066 was completed on 16/09/2008 at Alcoa Kwinana, Kwinana Beach, WA. PGSR provided Personnel for Generator Inspection and Clean. |
| Project 061 was completed on 2/09/2008 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for 30MW Mitsubishi Steam Turbine defect rectification. |
| Project 046 was completed on 28/08/2008 at Parkeston Power Station, Kalgoorlie, WA. PGSR provided Personnel for Removal and Reinstallation of overhauled 43MW Brush Generator. |
| Project 034 was completed on 22/08/2008 at BHP Boodarie Pig Iron Plant, Port Hedland, WA. PGSR provided Personnel for Frame 6B Gas Turbine Major Inspection (MI) and Generator Major Inspection. |
| Project 058 was completed on 13/08/2008 at Alcoa Pinjarra, WA. PGSR provided Personnel for HP Gland Steam Leak rectification. |
| Project 054 was completed on 4/08/2008 at Redbank Power Station, Singleton, NSW. PGSR provided Personnel for Steam Turbine Breakdown Defect Rectification. |
| Project 052 was completed on 29/07/2008 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine Breakdown Defect Rectification. |
| Project 035 was completed on 27/07/2008 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for 30MW Mitsubishi Steam Turbine Major Inspection. |
| Project 031 was completed on 4/07/2008 at BP Bulwer Island, Brisbane, QLD. PGSR provided Personnel for Worthington Simpson Steam Turbine Major inspection and Siemens Radial Air Compressor Major overhaul. |
| Project 036 was completed on 9/06/2008 at Penrice Soda Holdings, Osborne, SA. PGSR provided Personnel for Gas Compressor and Steam Turbine Inspection. |
| Project 040 was completed on 5/06/2008 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine HP Steam Leak rectification. |
| Project 038 was completed on 2/06/2008 at CSR Invicta, Cane Mill Power Station, QLD. PGSR provided Personnel for Steam Turbine Installation post overhaul. |
| Project 027 was completed on 22/04/2008 at BHP TEMCO, TAS. PGSR provided Personnel for Steam Turbine Installation post inspection. |
| Project 029 was completed on 21/04/2008 at Smithfield Energy Facility, Sydney, NSW. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 030 was completed on 16/04/2008 at Bundaberg Sugar, Babinda, QLD. PGSR provided Personnel for Steam Turbine Installation post inspection. |
| Project 025 was completed on 4/04/2008 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 028 was completed on 20/03/2008 at CSR Invicta, Cane Mill Power Station, QLD. PGSR provided Personnel for Steam Turbine Removal and overhaul. |
| Project 026 was completed on 7/03/2008 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for Steam Turbine Bearing Inspection. |
| Project 024 was completed on 27/02/2008 at Lihir Gold, Lihir Island, Papua New Guinea. PGSR provided Personnel for Demag Compressor Inspection. |
| Project 022 was completed on 31/01/2008 at Air Liquide, Kwinana Beach, WA. PGSR provided Personnel for Steam Turbine Inspection. |
| Project 023 was completed on 20/01/2008 at BHP Olympic Dam, SA. PGSR provided Personnel for Steam Turbine auxillary equipment defect rectification. |
| Project 010 was completed on 2/01/2008 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for 30MW Mitsubishi Steam Turbine Major Inspection. |
| Project 021 was completed on 28/12/2007 at Osborne Power Station, SA. PGSR provided Personnel for Steam Turbine Defect Rectification. |
| Project 019 was completed on 4/12/2007 at BHP TEMCO, TAS. PGSR provided Personnel for Steam Turbine Inspection and Removal. |
| Project 017 was completed on 24/11/2007 at Jeeralang Power Station, Morwell, VIC. PGSR provided Personnel for Frame 9B Gas Turbine Hot Gas Path Inspection (HGPI). |
| Project 018 was completed on 9/11/2007 at BHP Worsley Alumina, Collie, WA. PGSR provided Personnel for Frame 9E Gas Turbine Combustion Inspection (CI). |
| Project 020 was completed on 7/11/2007 at Pinjar Power Station, Perth, WA. PGSR provided Personnel for Frame 6B Gas Turbine Gearbox change. |
| Project 016 was completed on 14/10/2007 at Smithfield Energy Facility, Sydney, NSW. PGSR provided Personnel for Frame 6B Gas Turbine Hot Gas Path Inspection (HGPI). |
| Project 014 was completed on 27/09/2007 at Channel Island Power Station, Darwin, NT. PGSR provided Personnel for Steam Turbine Minor Inspection. |
| Project 013 was completed on 17/09/2007 at Osborne Power Station, SA. PGSR provided Personnel for Frame 9E Gas Turbine Hot Gas Path Inspection (HGPI) and Steam Turbine Major Inspection. |
| Project 012 was completed on 12/09/2007 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine Major Inspection, Unit 4. |
| Project 015 was completed on 11/09/2007 at Woodside, Cossack Pioneer, Offshore. PGSR provided Personnel for preparation of Technical documentation for Marine Steam Turbine Maintenance. |
| Project 004 was completed on 20/07/2007 at Minara Murrin Murrin, WA. PGSR provided Personnel for Steam Turbine Major Inspection. |
| Project 009 was completed on 19/07/2007 at Alcoa Wagerup, WA. PGSR provided Personnel for Steam Turbine Major Inspection, Unit 2. |
| Project 011 was completed on 15/07/2007 at Dampier Port Facility, Dampier, WA. PGSR provided Personnel for Steam Turbine Recommissioning of Unit 4 English Electric. |
| Project 008 was completed on 20/06/2007 at Flinders Power, Port Augusta, SA. PGSR provided Personnel for Steam Turbine Vibration Rectification and Inspection. |
| Project 002 was completed on 17/06/2007 at Alcoa Pinjarra, WA. PGSR provided Personnel for Steam Turbine Major Inspection, Unit 3. |
| Project 005 was completed on 19/05/2007 at Secret Harbour, WA. PGSR provided Personnel for Mobile Tool Container Construction. |
| Project 003 was completed on 26/04/2007 at Minara Murrin Murrin, WA. PGSR provided Personnel for ABB Gas Turbine Minor Inspection and Generator inspection. |
| Project 001 was completed on 4/04/2007 at Shell Clyde Refinery, NSW. PGSR provided Personnel for Steam Turbine Inspection. |
| Project 007 was completed on 2/04/2007 at BHP Worsley Alumina, Collie WA. PGSR provided Personnel for Frame 9E Gas Turbine Defect Rectification. |
| Project 006 was completed on 26/03/2007 at Smithfield Energy Facility, Sydney, NSW. PGSR provided Personnel for Frame 6B Gas Turbine Hot Gas Path Inspection (HGPI). |